Unconfigured Ad

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • incognitos
    Junior Member
    • Sep 2015
    • 9

    #1

    Miseq v3 600 cycle kit - poor read 1 quality

    Hi all,

    I recently completed a run using the Miseq v3 600 cycle kit.
    The read configurations were as follows:
    R1 = 300 cycles, R2 = 55 cycles, Index1 = 6 cycles.

    The library is an amplicon style construct of avg length ~550 bases and has a constant sequence at the beginning of Read 1 (~60-65 bases).

    The library was run with 20% PhiX spike-in. Custom primers were used, but these have been successfully used with v2 miseq kits as well as Nextseq kits without issue.

    Essentially, I need at least 250 bases on Read 1, whereas Read 2 need only be a max of 50-55 (no need for overlap on Read 1 and 2).

    I tried the v3 kit but the FastQC files show that the run was not particularly great for read 1. See attached slide for one of the libraries multiplexed in this run. Reads drop below Q30 pretty much within 100 bases.

    Does anyone have any insight here? After perusing through previous posts from a while back, I was thinking of maybe switching to the Miseq v2 300 cycle kit or the 500 kit. Do you think this is a good idea (e.g. going with long read for read 1 with 300 cycle kit)? Previous threads suggest that 500 kits have also been affected although their quality is still better than the 600 cycle kit.

    Appreciate your feedback!
    Attached Files
  • thermophile
    Senior Member
    • Apr 2015
    • 243

    #2
    Why pay for a 600 cycle kit but not use all of it?

    The qscores drop faster for v3 kits than v2. Regardless which kit, run the full thing so you have overlap to error correct the poor quality bases
    Microbial ecologist, running a sequencing core. I have lots of strong opinions on how to survey communities, pretty sure some are even correct.

    Comment

    • incognitos
      Junior Member
      • Sep 2015
      • 9

      #3
      Yes I see the waste of the reagents, but the 3'end of the library has a long stretch of Ts due to the polyA signal from mRNA. So going beyond 50 bases in the 3'end will result in unusable sequence anyways.

      I was wondering if anyone has any experience doing longer than 150 bases for read 1 with the miseq v2 300 cycle kit? I was considering an asymmetric run of 250 and 50 for R1 and R2, respectively.

      Comment

      • microgirl123
        Senior Member
        • Jun 2012
        • 199

        #4
        There's no reason you can't do 250x50 with a 300-cycle kit. You should end up with similar Q scores to Read 1 on a 500-cycle kit, which are okay at the end (not great, but okay).

        Comment

        Latest Articles

        Collapse

        • SEQadmin2
          Multiomic Liquid Biopsy: What DNA/RNA Panels Reveal That DNA Alone Can’t
          by SEQadmin2



          Tumors contain complex mixtures of cell populations that evolve in response to treatment and host-specific factors. Tissue biopsies provide only static snapshots of a tumor’s state. But what if we could follow that evolution over time using a minimally invasive technique?

          Liquid biopsies can detect tumor-derived material circulating in the bloodstream, providing a way to study treatment response, detect emerging resistance, and discover new biomarkers. Circulating
          ...
          10-14-2026, 09:55 AM
        • SEQadmin2
          New Genomics Technologies Take Aim at Long-Standing Limits
          by SEQadmin2


          Researchers using sequencing and genomics tools often have to make trade-offs. They can choose between speed or scale, short reads or long-range information, or targeted panels or a view of the whole transcriptome. New technologies that have been released this year are built to address those tough choices.

          We asked six companies the same four questions to learn about their latest products. The new technologies bring a lot to the table, including rethinking sequencing
          ...
          09-28-2026, 10:25 AM

        ad_right_rmr

        Collapse

        News

        Collapse

        Topics Statistics Last Post
        Started by SEQadmin2, 10-15-2026, 10:52 AM
        0 responses
        25 views
        0 reactions
        Last Post SEQadmin2  
        Started by SEQadmin2, 10-14-2026, 05:39 AM
        0 responses
        31 views
        0 reactions
        Last Post SEQadmin2  
        Started by SEQadmin2, 10-13-2026, 09:56 AM
        0 responses
        28 views
        0 reactions
        Last Post SEQadmin2  
        Started by SEQadmin2, 10-09-2026, 11:14 AM
        0 responses
        28 views
        0 reactions
        Last Post SEQadmin2  
        Working...