![]() |
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Changing HiSeq Parameters Mid Run | coleen_2 | Illumina/Solexa | 4 | 12-11-2018 09:07 AM |
Cost/run on HiSeq 2500 | Zimbobo | Illumina/Solexa | 32 | 01-13-2014 06:54 AM |
Multiplex scheme for Hiseq run | bruce01 | Illumina/Solexa | 9 | 08-30-2012 01:33 PM |
In search of a sign in the data: When is a HiSeq run really done? | elgor | Bioinformatics | 3 | 06-16-2011 09:40 AM |
Has Anyone stopped a HiSeq run due to low intensity clusters? | ashchin | Illumina/Solexa | 10 | 01-25-2011 04:03 PM |
![]() |
|
Thread Tools |
![]() |
#1 |
Senior Member
Location: Dronning Maud Land Join Date: Mar 2009
Posts: 129
|
![]()
The data set from the quick run mode on the HS2500 posted isn't too hopeful to have the proposed MiSeq run quality with a shorter run. Is it still spec'd to run PE-150 at a decent % >Q30?
https://basespace.illumina.com/run/1...enome-in-a-Day >= Q30 90.2% 123.7G R1 92.9% 63.7G R2 87.5% 60.0G ![]() Last edited by epistatic; 10-09-2012 at 03:24 PM. |
![]() |
![]() |
![]() |
#2 |
Senior Member
Location: East Coast USA Join Date: Feb 2008
Posts: 7,089
|
![]()
There is probably an inherent assumption that you are willing to sacrifice quality to some extent to get the rapid turnaround.
MiSeq (in specific instances, e.g. 16S multiplexed libraries) is showing similar problems with declining quality in later cycles for 2 x 250 cycle runs. |
![]() |
![]() |
![]() |
#3 |
Senior Member
Location: Dronning Maud Land Join Date: Mar 2009
Posts: 129
|
![]()
I am glad I was skeptical when I was told our HiSeq 2500 upgrade would allow >= 80% Q30 on PE-150 runs in the fast run mode and to expect >= 95% Q30 for PE-100. I was hoping to run TSCAP 250 bp capture panels on the HS2500 with PE-150.
We are still very anxious to get the upgrade for quick run times and the ability to run 2 lane flow cells. |
![]() |
![]() |
![]() |
Thread Tools | |
|
|